RESULTS FROM OUR CLIENT
The Problem: Our client (a leading Canadian retailer with a complex distribution network) faced challenges in increasing storage capacity and optimizing throughput. Their largest facilities were already operating at full capacity, and the requirements identified the retrofit implementation was required without disrupting ongoing operations.
The Solution: Maveneer provided a complete conceptual redesign and a phased implementation plan across their Canadian network of facilities to increase storage capacity, optimize inventory flow, and integrate automation—all while ensuring ongoing operations remained unaffected. The project involved multiple facility expansions, goods-to-person systems, and advanced conveyance upgrades.