RESULTS FROM OUR CLIENT
The Problem: During a retrofit project, Maveneer discovered several site conflicts that were incorrectly identified by the existing as-built drawings. These included rain drains, heaters, air conditioning units, and structural protrusions, such as beam widths, which conflicted with the original design plans.
The Solution: Using point cloud scanning and advanced 3D integrated modeling, Maveneer proactively identified and resolved these conflicts. By addressing issues related to rain drains, HVAC systems, and structural beams upfront, we ensured that the new design seamlessly integrated with the existing infrastructure, avoiding delays and costly rework during the implementation phase.