Blue Apron was recovering from significant rapid growth, quickly followed by a period of protracted customer and revenue contraction. This created a resource-constrained situation that limited the company's ability to invest in automation within their existing fulfillment centers, yet they had a mandate to reduce operational costs and find a path to profitable order fulfillment.
The largest and highest-volume fulfillment center, a 1M ft², FDA-regulated facility, became the focal point for immediate cost reduction.
Maveneer was asked to lead a comprehensive review of the operation and develop a design to address the problem. The Maveneer Advanced Analytical Suite, MaaSTM, was used to analyze operational and production data, perform discrete event simulations, and lay a quantitative foundation for evaluating process alternatives and technology opportunities.
Modeling results and design hypotheses were calibrated, verified, and operationally piloted. This comprehensive approach increased confidence in the analytical results while also allowing for operational feedback from workers and the management team to ensure that design conclusions and final recommendations were feasible, implementable, and met the company’s objectives.
Schedule a Meeting With a Maveneer Engineer
©2024 Maveneer, LLC All Rights Reserved. Sitemap.