CSC ServiceWorks faced challenges in their Atlanta refurbishment center, struggling with inefficiencies in refurbishing, packing, and shipping processes for field deployment. The facility lacked a streamlined flow, creating bottlenecks and limiting throughput. Additionally, ergonomic risks, underutilized inventory management, and inconsistent workstation designs were contributing to high labor costs and limited scalability.
How can inventory management and shipping processes be optimized to meet capacity demands?
Maveneer partnered with CSC ServiceWorks to design and implement a comprehensive solution tailored to meet the facility’s needs.
Process Optimization: Introduced standardized work processes and performance measurement systems to enforce quality expectations and minimize labor inefficiencies.
Universal Workstations: Designed flexible workstations with machine lifts and defined layouts to reduce ergonomic risks and enable scalability for future growth.
Improved Inventory Management:
Refurbishment Layout Redesign: Proposed a new layout to consolidate panel racking and refurbishment zones, improving workflow and enabling better forklift access.
Shipping and Storage Enhancements: Integrated single-layer machine shipping projects to simplify processes and increase branch participation, while recommending vertical storage to maximize space.
Implementation Schedule: Developed a phased implementation plan, allowing gradual integration of improvements within three months without disrupting ongoing operations.
Quick Payback: The business case demonstrated a payback period of less than one year, with some benefits realized within the first month.
Schedule a Meeting With a Maveneer Engineer
©2025 Maveneer, LLC All Rights Reserved. Sitemap.