RESULTS FROM OUR CLIENT
The Problem: Our client (a leading Canadian retailer with a complex distribution network) faced challenges in increasing storage capacity and optimizing throughput. Their largest facilities were already operating at full capacity, and the requirements identified the retrofit implementation was required without disrupting ongoing operations
The Solution: Maveneer delivered comprehensive distribution warehouse design services, including a conceptual redesign and phased implementation plan across their Canadian facilities. This resulted in increased storage capacity, optimized inventory flow, and integrated automation while maintaining uninterrupted operations. The project encompassed multiple facility expansions, goods-to-person systems, and advanced conveyance solutions.